Verified construction product

Sika Emseal

Wabo SeismicPan SPJ

Recessed edge frames and a seismic centering bar support the pan. Review the deck-to-deck detail for SPJ-400 and coordinate field infill and sealant.

Published technical facts

Specification record

Floor finish
Tile, stone, terrazzo and more · Finish infill at the walking surface · Source
Fire documentation
Emshield DFR option · UL 2079 barrier documentation · assembly open · Source
Installation
Recessed centering-bar pan · Deck-to-deck · concrete blockouts · Source
Seismic movement
4.75 in total travel · SPJ-400 · total as reported · Source
Joint opening
4 in nominal · SPJ family · 2–18 in · Source
Traffic and load
150 psf distributed live load · Foot and rolling traffic described · Source

Comparison and technical evidence

← Explore related products